
Kimball Hotel VRF Installation
Complete Mitsubishi City Multi VRF system installation for a boutique hotel providing independent temperature control across 120 rooms and 35% energy efficiency improvement.
The Challenge
The original rooftop units were 18 years old and failing frequently. Hotel guests experienced comfort issues with inconsistent temperatures, and operating costs were excessive. The hotel needed a solution that would minimize renovation disruption during peak season while providing superior guest comfort and energy efficiency.
Our Solution
We designed and installed a Mitsubishi City Multi VRF system with 8 modular outdoor units serving 120 indoor wall-mounted units. The system includes sophisticated building automation and zoned control allowing housekeeping to adjust guest room temperatures independently. Heat recovery capabilities allow simultaneous heating and cooling of different zones, maximizing efficiency year-round.
Scope of Work
Complete removal of old rooftop units, structural reinforcement for new outdoor units, refrigerant line installation throughout all 4 floors, installation of 120 wall-mounted indoor units, integrated controls and BACnet building automation integration, full system commissioning and staff training.
Results & Outcomes
Guest comfort scores increased 40% based on post-renovation surveys. Energy consumption decreased 35% compared to the previous system. Monthly utility costs dropped by $4,200. System downtime decreased from 12-15 incidents per year to zero in the first 18 months of operation.
Project Gallery




Project Info
Completion Date
August 2023
Location
Salt Lake City, UT
Project Type
Hotel Retrofit
Equipment & Systems
VRF SystemMitsubishi City MultiHeat RecoveryBuilding Automation
Ready to Transform Your Facility?
Contact Precision Air Management for a free consultation on your commercial HVAC project.
